Motor Vehicle Collision Response
| Motor Vehicle Collision Response* |
Fee/charge |
|
Engine, Rescue, Tanker, Squad, Ladder per unit/hour or portion thereof (Includes equipment costs, labour and materials)
|
|
$720.00
|
|
Command Vehicles, per unit/hour or portion thereof
(Includes equipment costs, labour and materials)
|
|
$210.00
|
|
Cost Recovery
Contractors, significant or specialized materials and resources
|
Cost Recovery
|
*Rates as set out in current Alberta Infrastructure & Transportation Policy #TCE- DC-501
Structure Fire Response
| Structure Fire Response* |
Fee/charge |
|
Engine, Rescue, Tanker, Squad, Ladder per unit/hour or portion thereof (Includes equipment costs, labour and materials)
|
|
$720.00
|
|
Command Vehicles, per unit/hour or portion thereof
(Includes equipment costs, labour and materials)
|
|
$210.00
|
|
Cost Recovery
Contractors, significant or specialized materials and resources
|
Cost Recovery
|
*Rates as set out in current Alberta Infrastructure & Transportation Policy #TCE- DC-501
Outdoor & Wildfire Response
| Outdoor & Wildfire Response* |
Fee/charge |
|
Engine, Rescue, Tanker, Squad, Ladder per unit/hour or portion thereof (Includes equipment costs, labour and materials)
|
|
$720.00
|
|
Command Vehicles, per unit/hour or portion thereof
(Includes equipment costs, labour and materials)
|
|
$210.00
|
|
Cost Recovery
Contractors, significant or specialized materials and resources
|
Cost Recovery
|
*Rates as set out in current Alberta Infrastructure & Transportation Policy #TCE- DC-501
Public Assist Response
| Public Assist Response* |
Fee/charge |
|
Engine, Rescue, Tanker, Squad, Ladder per unit/hour or portion thereof (Includes equipment costs, labour and materials)
|
|
$720.00
|
|
Command Vehicles, per unit/hour or portion thereof
(Includes equipment costs, labour and materials)
|
|
$210.00
|
|
Cost Recovery
Contractors, significant or specialized materials and resources
|
Cost Recovery
|
*Rates as set out in current Alberta Infrastructure & Transportation Policy #TCE- DC-501
Hazardous Materials Response
| Hazardous Materials Response |
Fee/charge |
|
Third Party Response & Mitigation Fees (including consumables)
|
Cost Recovery + 10%
|
Residential False Alarm Recovery
| Nuisance Alarm |
Fee/charge |
|
Residential
|
|
|
First Annual False Alarm
|
N/A
|
|
Second Annual False Alarm
|
$100.00
|
|
Third/Ongoing Annual False Alarm
|
$450.00
|
Commercial/Industrial - Compliant Alarm System Recovery
| Incident |
Fee/charge |
|
First Annual False Alarm
|
N/A
|
|
Second Annual False Alarm
|
$500.00
|
|
Third/Ongoing Annual False Alarm
|
$500.00
|
Commercial/Industrial - Non-Compliant Alarm System Recovery
| Incident |
Fee/charge |
|
First Annual False Alarm
|
$500.00
|
|
Second Annual False Alarm
|
$750.00
|
|
Third/Ongoing Annual False
|
$1000.00
|
Non-Emergent Boat Recovery
| Incident |
Fee/Charge |
|
Non Emergent Boat Recovery
|
$235.00
|
Other Related Fees and Charges
| Fire & Safety Code Inspection |
Fee/Charge |
|
First Inspection of Occupancy
|
$0
|
| First Re-Inspection |
$0
|
| Second Re-Inspection |
$250.00 |
| Third & Subsequent Re-Inspections |
$500.00 |
| Sale of Commercial Property - Pre-purchase inspection (upon request) |
$250.00 |
| Fire Investigation |
Fee/Charge |
|
Investigation Report (Routine Disclosure)
|
$275.00
|
| Maximum Occupant Load Card |
Fee/Charge |
|
On-Site Measurement Required
|
$0
|
|
Issue Only
|
$0 |
|
On-Site Measurement and/or Issue (Not-for-profit agency)
|
$0 |
| Fireworks Permit |
Fee/Charge |
|
Permit to sell Fireworks (low level) or Shop Goods - Annual
|
$150.00
|
| Sales and Rentals |
Fee/Charge |
|
WASP Home Sprinkler Kit
|
Cost Recovery + 5%
|
|
FireSmart power equipment rentals (Credit Card Required, Refundable)
|
$500.00
|
| Other |
Fee/Charge |
|
Third Party Cost Recovery (i.e. cellulose insulation removal, disposal fees, contract security services, etc.)
Providing security and/or fire watch for a fire scene where the insurance adjuster could not be reached to provide security (per person/per hour)
|
Cost Recovery + 10%
$100.00
|